CRI project management and technical services

1. Principle of Cutting Re-injection
In order to prevent environment pollution, wasted oil based mud and cutting with oil produced during the process of drilling is injected into the qualified formation, which is a kind of drilling wasted treatment method and also called CRI.
Cutting is transmitted to coarse tank filled with sea water by auger system after flowed to shale shaker through mud ditch. A kind of mixture will come into being while cutting and sea water is agitating by agitator, which will be grinded by centrifugal pump. After that cutting slurry will be transmitted to classification shaker by centrifugal pump for classifying. The solids which are smaller than the shaker screen will be transmitted to fine tank while the bigger ones will be back to coarse tank for further grinding. The slurry in the fine tank will form a kind of liquid with certain viscosity after adding viscosifying agent and then will be injected into pre-set formation by high pressure pump. This is the brief flow chart of CRI.
2. Project & Technical Feasibility Studies
CRI

3.Geological formation evaluations

CRI

4.CRI designing and formation selection

a.Cutting re-injection via annular of existing producer
b.Cutting re-injection via annular of existing producer
c.Cutting re-injection via annular, drilling and CRI operation running synchronously.
d.Cutting re-injection via tubing of exiting abandoned well
e.Cutting re-injection via tubing of the specified Cutting re-injection well

CRI