Home>> Products and Services >> Case History

Oilfield Services Business -Case History

  Successfully provided acidizing services in Qinghai Oilfield since 2003.
  Successfully provided pumping services for ConocoPhillips CRI operation on Nanhai 1 Platform, and won highly praise from our cooperation partner and Drilling Supervisor of ConocoPhillips.
  Successfully provided pumping services (includes primary pump and backup pump, 2 years contract) for ConocoPhillips CRI operation on C Platform, and won highly praise from Drilling Supervisor of ConocoPhillips.
  Successfully provided pumping OBM service for ConocoPhillips on A Platform along with ConocoPhillipss mud pump, and won highly praise from Drilling Supervisor of ConocoPhillips.
  Jereh is the designated vendor of ConocoPhillips to provide the pumping services for Acid/Xylene/Diesel/Brine/Water/OBM/WBM/Fluid etc. for WHP A and C of Penglai 19-3 Project.
  As a qualified vendor of ConocoPhillips, Jereh attended  the CRI bid of ConocoPhillips phase II and won the bid of B platform CRI services finally. So far, Jereh has installed the Data Acquisition System and commissioned it successfully.
As a qualified vendor of ConocoPhillips, Jereh attends the CRI bid of D/E/F Platforms of ConocoPhillips phase
Provided data acquisition system for ConocoPhillips CRI operation on B Platform.
  Provided backup pump for ConocoPhillips CRI operation on B Platform.
Provided temporary tank for ConocoPhillips CRI operation on B Platform.
Provided WECO 1502 Chiksan & accessories with daily maintenance for for ConocoPhillips CRI operation and completion application on B & C Platform.
Provided WECO 1502 Chiksan & accessories with daily maintenance for CRI backup pipeline application on C Platform.
As a local vendor, Jereh enjoys quick response capability which can be reflected by a case in 2006 that when the electrical motor CRI pump had damage on power end and back up CRI pump had fractured pipes, as required from COPC, Jereh mobilized related equipment to designated location within 12 hours and finished commission/test of the equipment on offshore rigs within 2 hours so as to re-continue CRI operation.
  Successfully supply mud pump parts, BOP parts, manifold and screen parts, etc. for Kerr-McGee and Roc Oil.
  As a qualified vendor of ConocoPhillips, Jereh attended the CRI bid of ConocoPhillips phase II, and won the bid of D/E/F platforms CRI Unit fabrication and CRI services finally.